![Petition in respect of Singrauli Super Thermal Power Station- 2000 MW (“SSTPS”) under Regulation – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition in respect of Singrauli Super Thermal Power Station- 2000 MW (“SSTPS”) under Regulation – EQ
0
0
Petition in respect of Singrauli Super Thermal Power Station- 2000 MW (“SSTPS”) under Regulation
For more information please see below link:
Related posts:
- Petition For Approval of Station Heat Rate, On Actual Basis, of Thermal Power Plant (270 MW) Located At Village Kasaipali, Chhattisgarh – EQ Mag Pro
- Petition for approval of introduction of the Hydro Two Day Ahead Contracts, Hydro Green Term Ahead Contracts, Weekly Uniform Price Contracts – EQ Mag Pro
- Petition for truing-up of tariff for the period 2014-19 and determination of tariff for the period 2019-24 in respect of Chamera-II Hydroelectric Project (300 MW). NHPC Limited – EQ
- Petition for determination of tariff for the 2019-24 tariff period in respect of the National Capital Thermal Power Station, Dadri Stage-I (4×200 MW). NTPC Limited – EQ