Petition No. 30/GT/2020 regarding the determination of tariff of Nathpa Jhakri Hydro Power Station (1500 MW) for the period from 1.4.2019 to 31.3.2024
0
0
Review of Commission’s Order dated 16.9.2021 in Petition No. 30/GT/2020 regarding the determination of tariff of Nathpa Jhakri Hydro Power Station (1500 MW) for the period from 1.4.2019 to 31.3.2024
For more information please see below link: