![Petition of Adani Electricity Mumbai Limited- Distribution seeking approval for Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2020/05/Power-consumption-of-large-commercial-players-has-dropped-sharply-says-Tata-Power-MD-Praveer-Sinha.jpg)
Petition of Adani Electricity Mumbai Limited- Distribution seeking approval for Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects – EQ Mag
0
0
Petition of Adani Electricity Mumbai Limited- Distribution seeking approval for Long-Term procurement of power 500 MW from grid connected Renewable Energy Power Projects.
For more information please see below link:
Related posts:
- Petition seeking approval for adoption of Tariff for Procurement of 500 MW power on Long term from grid connected Solar Power Projects – EQ Mag Pro
- Petition for adoption of the tariff discovered through the competitive bidding process held for long term procurement of 500 MW wind-solar hybrid power from the grid connected power projects – EQ Mag Pro
- Petition Has Been Filed By JSW Steel Limited Challenging the Impugned Order Passed By MERC
- Petition for approval of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-IV (500 MW) for the 2019-24 tariff period NTPC Limited – EQ Mag Pro