
Petition of Adoption of tariff for long term procurement of 150 MW power from intra-state grid connected solar power projects – EQ
0
0
Petition of Adoption of tariff for long term procurement of 150 MW power from intra-state grid connected solar power projects
For more information please see below link:
Related posts:
- Petition for Adoption of tariff for Long Term Procurement of 300 MW Power from Grid Connected Wind-Solar Hybrid Project by the Ministry of Power – EQ
- Petition for Adoption of Tariff for the ISTS Grid connected Solar PV projects of 2400 MW including capacity of 1200 MW with “Greenshoe Option” by Ministry of Power – EQ
- Petition for Adoption of Tariff for the ISTS Grid connected 1400 MW Renewable Energy Power Projects coupled with Energy Storage System – EQ
- Petition of Adoption of tariff for procurement of storage capacity from Green Shoe standalone BESS under competitive bidding process to be installed in MSEDCL sub-stations – EQ
tags:
150 MW Power ADOPTION grid connected intra state long term procurement MERC REGULATIONS SOLAR POWER PROJECTS