
Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector – EQ
0
0
Petition of Adoption of usage charges for 510 MW Solar PV Power Station (Tranche-III) connected to the Inter-State Transmission System under Central Power Sector
For more information please see below link:
Related posts:
- Petition for Adoption of tariff of 1000 MW Wind-Solar Hybrid Power Projects connected to the inter-State Transmission System – EQ
- Petition for Adoption of tariff of Wind Power Projects (Tranche XVIII) connected to the inter-State Transmission System of the Ministry of Power, Government of India – EQ
- Petition for Adoption of tariff for 1500 MW Solar PV Power Projects connected to the inter-State Transmission System – EQ
- Petition for the Adoption of tariff for 2000 MW inter-State Transmission System Solar PV Power Projects with Energy Storage System (SECI ISTS XVII) – EQ
tags:
510 MW ADOPTION CERC inter state transmission system Solar PV power station Tranche-III usage charges