
Petition of CERC (Terms and Conditions of Tariff) Regulations for recoupment of under-recovered energy charges due to the control of generating station of Chutak Power Station – EQ
0
0
Petition of CERC (Terms and Conditions of Tariff) Regulations for recoupment of under-recovered energy charges due to the control of generating station of Chutak Power Station
For more information please see below link:
Related posts:
- Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the tariff period from 1.4.2024 to 31.3.2029 – EQ
- Petition of Application to CERC (Terms and Conditions of Tariff) Regulations – EQ
- Petition of the CERC (Terms and Conditions of Tariff determination from Renewable Energy Sources) and (Conduct of Business) Regulations Tariff for 50 MW of NTPC Limited – EQ
- Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2021 – EQ Mag Pro
tags:
CERC generating station recoupment REGULATIONS Terms and Conditions of Tariff under-recovered energy