![Petition of PPA entered into between GUVNL & Adani Power (Mundra) Limited – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition of PPA entered into between GUVNL & Adani Power (Mundra) Limited – EQ Mag Pro
0
0
Petition of PPA entered into between GUVNL & Adani Power (Mundra) Limited.
For more information please see below link:
Related posts:
- Petition of Supplemental PPA entered into between the GUVNL and the APMuL in regard to the base rate – EQ Mag Pro
- Petition of PPA entered into between the GUVNL and the APMuL in regard to the base rate – EQ Mag Pro
- Petition of PPA entered into between GUVNL & APMuL – EQ Mag Pro
- Petition For Approval of Station Heat Rate, On Actual Basis, of Thermal Power Plant (270 MW) Located At Village Kasaipali, Chhattisgarh – EQ Mag Pro