1. Home
  2. Policy & Regulation
  3. Petition of PPA for the development of 390 MW (2×195 MW) ISTS connected Wind-Solar Hybrid power project(s) entered between AHEJOL & SECI – EQ
Petition of PPA for the development of 390 MW (2×195 MW) ISTS connected Wind-Solar Hybrid power project(s) entered between AHEJOL & SECI – EQ

Petition of PPA for the development of 390 MW (2×195 MW) ISTS connected Wind-Solar Hybrid power project(s) entered between AHEJOL & SECI – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network