![Petition of PPA for the development of 390 MW ISTS connected Wind-Solar Hybrid power project(s), entered between Adani Hybrid Energy Jaisalmer One Limited and SECI – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition of PPA for the development of 390 MW ISTS connected Wind-Solar Hybrid power project(s), entered between Adani Hybrid Energy Jaisalmer One Limited and SECI – EQ Mag
0
0
Petition of PPA for the development of 390 MW ISTS connected Wind-Solar Hybrid power project(s), entered between Adani Hybrid Energy Jaisalmer One Limited and SECI.
For more information please see below link:
Related posts:
- Petition of the long-term PPA entered into between M/s Powerica Limited and SECI for approval of Change in Law events – EQ Mag Pro
- Petition of PPA entered into between the Adani Green Energy and the SECI seeking extension of Scheduled Date of Commissioning of the project without the levy of the penalty. – EQ Mag Pro
- Petition of PPA entered into between M/s Powerica Limited and SECI for approval of Change in Law events – EQ Mag
- Petition of PPA between M/s ReNew Sun Waves Private Limited and Solar Energy Corporation of India Limited – EQ Mag
tags:
Adani Hybrid Energy Jaisalmer One Limited CERC Petition PPA SECI WIND SOLAR HYBRID POWER PROJECTS