![Petition of PPA for the development of 450 MW ISTS connected Wind-Solar Hybrid power project, entered between ASEJOP & SECI – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition of PPA for the development of 450 MW ISTS connected Wind-Solar Hybrid power project, entered between ASEJOP & SECI – EQ
0
0
Petition of PPA for the development of 450 MW ISTS connected Wind-Solar Hybrid power project, entered between ASEJOP & SECI
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 450 MW grid connected solar PV power projects selected through competitive bidding process – EQ Mag Pro
- Petition for the development of 450 MW ISTS connected Wind-Solar Hybrid power project – EQ Mag
- Petition for the development of 450 MW ISTS connected Wind-Solar Hybrid power project, entered between ASEJOPL and SECI – EQ
- Petition for approval of tariff of Singrauli Super Thermal Power Station (2000 MW) NTPC Limited – EQ Mag Pro