Petition of the CERC (Terms and Condition of Tariff) Regulations, 2019 for installation of various Emission Control Systems in RTPS (2×600 MW) – EQ
0
0
Petition of the CERC (Terms and Condition of Tariff) Regulations, 2019 for installation of various Emission Control Systems in RTPS (2×600 MW)
For more information please see below link:
Related posts:
- Petition of the CERC (Terms and Condition of Tariff) Regulations for installation of various Emission Control Systems in Bokaro-A Thermal Power Station (1×500 MW) – EQ
- Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the Central Electricity Regulatory Commission Regulations, 2020.
- Petition of the CERC (Terms and Conditions of Tariff), Regulations 2019 – EQ
- Petition of the CERC (Terms & Conditions of Tariff) Regulations, 2024 – EQ