Petition of the CERC(Terms and Conditions of Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, challenging the nongrant of REC Certificate – EQ Mag
0
0
Petition of the CERC(Terms and Conditions of Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, challenging the nongrant of REC Certificate.
For more information please see below link:
Related posts:
- Petition for determination of tariff for the 2019-24 tariff period in respect of the Kahalgaon Super Thermal Power Station, Stage-II (1500 MW). NTPC Limited – EQ Mag
- Petition in respect of the schedule for operation of 726.6 MW (2×363.3 MW) Palatana Project of ONGC Tripura Power Company Limited – EQ Mag
- Petition for seeking compensation due to increase in costs on account of change in rates of Goods and Service Tax amounting to a Change in Law event – EQ Mag
- Petition for adoption of tariff discovered through Competitive Bidding Process for procurement of power from the 1200 MW Grid-Connected Solar PV Power Project – EQ Mag