
Petition of the Electricity Act with the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Power Projects – EQ
0
0
Petition of the Electricity Act with the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Power Projects
For more information please see below link:
Related posts:
- Petition of the Electricity Act for noncompliance of the Commission’s direction – EQ
- Petition of the Electricity Act the bid process initiated by SECI with the PPA is a nullity – EQ
- Petition for Adoption of Tariff for the ISTS Grid connected Solar PV projects of 2400 MW including capacity of 1200 MW with “Greenshoe Option” by Ministry of Power – EQ
- Petition of the Electricity Act for Adoption of Transmission Charges with respect to the Transmission System being established by Pune – III Transmission Limited – EQ
tags:
CERC competitive bidding process grid connected procurement of power REGULATIONS tariff based the Electricity Act the Guidelines wind power projects