1. Home
  2. Policy & Regulation
  3. Petition of the PPA for the development of 390 MW ISTS connected Wind-Solar Hybrid power project(s), entered between Adani Hybrid Energy Jaisalmer One Limited – EQ
Petition of the PPA for the development of 390 MW ISTS connected Wind-Solar Hybrid power project(s), entered between Adani Hybrid Energy Jaisalmer One Limited – EQ

Petition of the PPA for the development of 390 MW ISTS connected Wind-Solar Hybrid power project(s), entered between Adani Hybrid Energy Jaisalmer One Limited – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network