Petition seeking relief in time extension granted for commissioning of the Petitioner’s 50 MW Wind Power Project connected to Central Grid
0
0
Petition under Section 79 of the Electricity Act, 2003 seeking relief in time extension granted for commissioning of the Petitioner’s 50 MW Wind Power Project connected to Central Grid
For more information please see below link:
Related posts:
- Draft Amendment for “Grant of connectivity to Projects based on Renewable Sources to Inter-State Transmission System”
- Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the Central Electricity Regulatory Commission Regulations, 2020.
- CERC Directs PGCIL Not to Encash Bank Guarantees of Terminated Wind Projects
- Transfer of RECs Allowed by APTEL of Bagasse-Based Power Project