Porcurment of ABB INVERTER SPARES FOR 10 MW SOLAR PV PLANT at NTPCRamagundam
3
0
Porcurment of ABB INVERTER SPARES FOR 10 MW SOLAR PV PLANT at NTPCRamagundam
For more information please see below link:
Related posts:
- RFS for 35 MW Solar PV projects in Puducherry: extension of bid submission deadlines
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND OPERATION A MAINTENANCE FOR A PERIOD OF 5 YEARS, OF TOTAL 10 KW CAPACITY
- NIT for Installation and Commissioning for 25 Nos. of 30 kWp grid connected SPV Power Plant.
- BHEL Floats Tender For Supply of Cables for Raghanesda Solar Power project