1. Home
  2. Tenders
  3. POSTPONEMENT OF THE RFS UPLOADING : DESIGN, ENGINEERING, SUPPLY, CONSTRUCTION, ERECTION, TESTING, COMMISSIONING INCLUDING 10 YEARS PLANT O&M OF 2 MW (AC) SOLAR PV POWER PLANT WITH 01 MW BESS AT KAZA, HIMACHAL PRADESH
POSTPONEMENT OF THE RFS UPLOADING : DESIGN, ENGINEERING, SUPPLY, CONSTRUCTION, ERECTION, TESTING, COMMISSIONING INCLUDING 10 YEARS PLANT O&M OF 2 MW (AC) SOLAR PV POWER PLANT WITH 01 MW BESS AT KAZA, HIMACHAL PRADESH

POSTPONEMENT OF THE RFS UPLOADING : DESIGN, ENGINEERING, SUPPLY, CONSTRUCTION, ERECTION, TESTING, COMMISSIONING INCLUDING 10 YEARS PLANT O&M OF 2 MW (AC) SOLAR PV POWER PLANT WITH 01 MW BESS AT KAZA, HIMACHAL PRADESH

92
0

This has reference to the NIT No. SECI/C&P/KAZA/ 042018 published dated 26.04.2018 regarding the RfS for Design, Engineering, Supply, Construction, Erection, Testing, Commissioning including 10 Years Plant O&M of 2 MW (AC) Solar PV Power Plant with 01 MW BESS at KAZA, Himachal Pradesh.

The RfS documents for the captioned NIT which was to be uploaded on 07.05.2018 by 1800 HRS has been postponed till 1800 HRS on 14.05.2018.

Prospective bidders are required to kindly be updated through SECI website www.seci.co.in for any further updates regarding this NIT/ RfS.

Source : seci
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *