1. Home
  2. Featured
  3. POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 2000MW (250MW X 8) ISTS CONNECTED S
POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 2000MW (250MW X 8) ISTS CONNECTED S

POSTPONEMENT OF THE TENDER UPLOADING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 2000MW (250MW X 8) ISTS CONNECTED S

118
0

This has reference to the NIT No. SECI/C&P/SPD/RfS/2000MW/122017 published dated 29.12.2017 regarding the RfS Selection of Solar Power Developers for Setting up of 2000MW (250MW x 8) ISTS Connected Solar Power Projects, 250MW Capacity each of 08 Nos. of Packages to be installed anywhere in India.

The RfS documents for the captioned RfS which was to be uploaded on 08.01.2018 has been postponed till further notice.

The revised dates for the document uploading will be intimated shortly.

Prospective bidders are required to kindly be updated through SECI website www.seci.co.in for any further updates regarding this RfS.

Source: seci.co.in
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *