POSTPONEMENT OF THE TENDER UPLOADING : SETTING UP OF 2000MW (250MW X 8) ISTS CONNECTED SOLAR POWER PROJECTS
67
0
This has reference to the NIT No. SECI/C&P/SPD/RfS/2000MW/122017 published dated 29.12.2017 regarding the RfS Selection of Solar Power Developers for Setting up of 2000MW (250MW x 8) ISTS Connected Solar Power Projects, 250MW Capacity each of 08 Nos. of Packages to be installed anywhere in India.
The RfS documents for the captioned RfS which was to be uploaded on 08.01.2018 has been postponed till further notice.
The revised dates for the document uploading will be intimated shortly.
Prospective bidders are required to kindly be updated through SECI website www.seci.co.in for any further updates regarding this RfS.
Source: seci.co.in
Related posts:
- Status Of Renewable Energy Power Projects Commissioned In Andhra Pradesh State A
- Interim Report Prepared for – M/s. Solar Energy Corporation Of India Limited (SECI)
- Request for comments of stakeholder on BIS Standards for Solar Photovoltaic Water Pumping Systems
- Petition u/s 63 and 86(1)(b) of Electricity Act, 2003 r/w BERC (Power Purchase and Procurement Process of Licensee) Regulation, 2018