Pre-bid and Site visit for 2 MW Solar PV Project in Haldia, West Bengal
This has reference to the NIT (NIT No. SECI/SD/1/NIT/2016/KOPT/HDC02) for DESIGN, ENGINEERING, PROCUREMENT & SUPPLY, CONSTRUCTION & ERECTION, TESTING & COMMISSIONING AND COMPREHENSIVE OPERATION & MAINTENANCE FOR 10 YEARS OF 2 MW (AC) SOLAR PV PLANT ON TURNKEY BASIS AT SALUKKHALI, HALDIA DISTRICT – PURBA MEDINIPUR STATE: WEST BENGAL.
The site vist and the pre-bid meetiung is scheduled on 18.03.2016. The venue for Pre-bid meeting on 18.03.2016 is mentioned below.
Venue: Haldia Dock Complex, Haldia
In view of the smooth arrangement for the meeting, prospoective bidders who are willing to attend the pre-bid meeting are requested to send the email to vkumar@seci.gov.in mentioning the details of the attendees (maximum 2 persons per company) at the earliest not later than (16.03.2016, 17:00 Hrs.).
Prospective bidders may carry out the site visit on their own prior to the pre-bid meeting. In this regard, the contact details of the concerned person is mentioned below.
Sri R N Roy, (M: 09434074411)
Related posts:
- EMPANELMENT OF SUITABLE SUPPLIER FOR SUPPLY OF SOLAR PV MATERIAL FOR INHOUSE MANUFACTURING OF SOLAR MODULE AT ITI LIMITED
- Providing and Erecting LED Street Light, Solar LED Fittings at, NAVHA (Bhim Nagar) Tq.PALAM, Dist.Parbhani
- Invitation of TECHNICAL and COMMERCIAL BIDS for SOLAR POWER KIT
- Supply and I AND C of Balance of System BOS package for 100MW GSECL