Pre-bid Tie-up for Design, Supply, Installation and Commissioning of approx. 768 Nos. of 5 KWp Rooftop Solar PV Power plants Hybrid Grid Tied with Battery Bank including 5 years operation and maintenance in Jammu and Kashmir State
44
0
Pre-bid Tie-up for Design, Supply, Installation and Commissioning of approx. 768 Nos. of 5 KWp Rooftop Solar PV Power plants Hybrid Grid Tied with Battery Bank including 5 years operation and maintenance in Jammu and Kashmir State
For more information please see below link:
Related posts:
- Pre-Bid Tie-up for Design, Supply, Installation, Commissioning with 5 Years Comprehensive Warranty and Maintenance of White LED based off grid Solar Home Systems for Electrification of UE HHs in Villages and Dhanies under Saubhagya Scheme in Rajasthan
- Design, Engineering, Supply, Construction, Erection, Testing and Commissioning including 10 Years Plant O and M of 2X1.5 MW -AC- Solar PV Power Plant with BESS at Tangtse and Durbuk in Leh district of J and K
- Pre-Bid Tie-Up for Design, Supply, Installation and Commissioning of 1 KWp Rooftop Solar PV Power Plants Off Grid including one year warranty and 4 years Annual Maintenance Contract in 843 Schools in Jammu and Kashmir State
- PRE-BID TIE-UP FOR Design, Manufacturing, Supply, Erection, Testing and Commissioning of Standalone OFF-Grid Solar Street Lights in PAN India basis including complete system warranty and its AMC for 5 years under ATAL JYOTI YOJANA (AJAY)
tags:
Installation and Commissioning of approx. 768 Nos. of 5 KWp Rooftop Solar PV Power plants Hybrid Grid Tied with Battery Bank including 5 years operation and maintenance in Jammu and Kashmir State Pre-Bid Tie-up for Design Supply