
Providing and Installation of 15 KW Roof Top Solar Panel Grid Power Plant
31
0
Construction of B Type School Building and Staff Quarters for Kendriya Vidyalaya at Datia M.P.. SH:Providing and Installation of 15 KW Roof Top Solar Panel Grid Power Plant.
For more information please see below link:
Related posts:
- Tender for Feasibility study of Solar Power Plant 1MW Grid connected
- Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years at GAIL Petrochemical Complex, Pata, Auriaya, (U.P)
- SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 15 W INTEGRATED SOLAR LED STREET LIGHT (ALL IN ONE)
- REIL Floats Tender For Installation of 2MWp Solar PV based power project