Rajasthan Electricity Regulatory Commission: In the matter of determination of generic tariff for sale of electricity to Distribution Licensee from Wind Power Plants getting commissioned in the State during FY 2016-17.
Government of India (GoI), in its National Tariff Policy notified on 28.01.2016 at para 6.4(2), has provided that States shall endeavour to procure power from the renewable energy sources through competitive bidding, except in the case of purchase of power from the waste to energy plants, to keep the tariff low. Procurement of power by Distribution Licensees from RE sources for the notified capacity shall be done through competitive bidding process from the date to be notified by the Central Government. However, till such notification, any such procurement of power from the renewable energy sources may be done under Section 62 of the Electricity Act, 2003. Therefore, Commission in exercise of its power conferred under Section 62 read with Section 64 of the Electricity Act, 2003 and the RERC RE Tariff Regulations, 2014 proposes to determine the generic tariff of Wind Power Plants getting commissioned during FY 2016-17.
For More Information Pls.Go Through Below Attached Documents..
Related posts:
- In the matter of: Petition for revision of minimum quantum of purchase (in %) from renewable energy sources
- In the matter of: Petition for change of name and further necessary changes in documents held in the name of ‘IPCL Power Trading Private Limited’ to ‘Saranyu Power Trading Private Limited’
- Petition of Sai Wardha Power Generation Limited seeking declaration of Captive Status with respect to its 2 x 135 MW Generating Units No. 3 and 4 for FY 2017-18
- Petition for approval of Truing Up for FY 2019-20, Annual Performance Review of FY 2020-21