![Rate Contract for Supply of BOS for Stand-alone Off Grid Solar Photovoltaic Water Pumping Systems in Madhya Pradesh](https://www.eqmagpro.com/wp-content/uploads/2020/06/CEL-Floats-Tender-For-3-Lakh-Multi-crystalline-Solar-Cells.png)
Rate Contract for Supply of BOS for Stand-alone Off Grid Solar Photovoltaic Water Pumping Systems in Madhya Pradesh
0
0
Rate Contract for Design, Manufacture, Supply, Erection, Testing and Commissioning of BOS for Stand-alone Off Grid Solar Photovoltaic Water Pumping Systems in Madhya Pradesh basis including complete system warranty and its operation and maintenance
For more information please see below link: