Report on Powergrid’s intent of sharing of Transmission Infrastructure with Telecom Operators with regard to Commissions’ direction during hearing held on 11.1.2018 in Petition No. 180/MP/2017
17
0
Report on Powergrid’s intent of sharing of Transmission Infrastructure with Telecom Operators with regard to Commissions’ direction during hearing held on 11.1.2018 in Petition No. 180/MP/2017.
For more information please see below link: