![REQUEST FOR SELECTION (RfS) FOR PURCHASE OF POWER THROUGH COMPETITIVE BIDDING PROCESS FOLLOWED BY E-REVERSE AUCTION FROM GRID CONNECTED WIND-SOLAR HYBRID POWER PROJECTS AT IDENTIFIED SITES.](https://www.eqmagpro.com/wp-content/uploads/2019/01/REQUEST-FOR-SELECTION-RfS-FOR-PURCHASE-OF-POWER-THROUGH-COMPETITIVE-BIDDING-PROCESS-FOLLOWED-BY-E-REVERSE-AUCTION-FROM-GRID-CONNECTED-WIND-SOLAR-HYBRID-POWER-PROJECTS-AT-IDENTIFIED-SITES..jpg)
REQUEST FOR SELECTION (RfS) FOR PURCHASE OF POWER THROUGH COMPETITIVE BIDDING PROCESS FOLLOWED BY E-REVERSE AUCTION FROM GRID CONNECTED WIND-SOLAR HYBRID POWER PROJECTS AT IDENTIFIED SITES.
50
0
REQUEST FOR SELECTION (RfS) FOR PURCHASE OF POWER THROUGH COMPETITIVE BIDDING PROCESS FOLLOWED BY E-REVERSE AUCTION FROM GRID CONNECTED WIND-SOLAR HYBRID POWER PROJECTS AT IDENTIFIED SITES.
For more information please see below link:
Related posts:
- Azure Power Announces Results for Fiscal Third Quarter 2017
- Daqo New Energy Announces Expansion Plan to Increase Production Capacity to 65,000 MT by 2020
- Extension of time for Scheduled Commissioning Date (SCD) for Solar Projects delayed due to non – readiness of Internal Evacuation/Transmission system by the Solar Power Park Developer (SPPD)/ Solar Park Implementation Agency (SPIA) – Reg.
- China state fund CNIC eyes stake in Indian renewable firm Greenko Group – Bloomberg