Retail Supply Tariff approved by KERC in Tariff Order 2017-18 Dated: 11.04.2017 for BESCOM
Sl.N
o
Tariff Category Category Description Particulars Existing Tariff as per Tariff Order-2016 Particulars Approved as per Tariff Order 2017
LOW TENSION SUPPLY
1 LT-1 BJ/KJ Fully subsidized by GOK Free Fully subsidized by GOK Free
Monthly Min. per Installation per Month. Rs 30/- Monthly Min. per Installation per Month. Rs 30/-
CDT(Commission Determined Tariff) EC per KWH (Upto 18 units/ month) 596 Paise CDT(Commission Determined Tariff) EC per KWH (Upto 40 units/ month) 648 Paise
2 LT-2(a)(i) Domestic – Applicable to Areas under Bruhat Bangalore Mahangara Palike (BBMP),Municipal Corporations and all Urban Local Bodies Sanctioned Load Fixed Charge (FC) Sanctioned Load Fixed Charge (FC)
FC For Ist KW Rs.30/- FC For Ist KW Rs.40
FC For addl. KW Rs.40/- FC For addl. KW Rs.50
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 30 KWH 300 Ps 0 to 30 KWH 325 Ps
31 to 100 KWH 440 Ps 31 to 100 KWH 470 Ps
101 to 200 KWH 590 Ps 101 to 200 KWH 625 Ps
Above 200 KWH 690 Ps 201 to 300 KWH 730 Ps
301 to 400 KWH 735 Ps
401 to 500 KWH 740 Ps
Above 500 KWH 740 Ps
3 LT-2(a)(ii) Domestic – Applicable to Areas under Village Panchayats Sanctioned Load Fixed Charge (FC) Sanctioned Load Fixed Charge (FC)
FC For Ist KW Rs.20/- FC For Ist KW Rs.25
FC For addl. KW Rs.30/- FC For addl. KW Rs.40
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 30 KWH 290 Ps 0 to 30 KWH 315 Ps
31 to 100 KWH 410 Ps 31 to 100 KWH 440 Ps
101 to 200 KWH 560 Ps 101 to 200 KWH 595 Ps
Above 200 KWH 640 Ps 201 to 300 KWH 680 Ps
301 to 400 KWH 685 Ps
401 to 500 KWH 685 Ps
Above 500 KWH 685 Ps
4 LT-2(b)(i) Pvt. Educational Institutions & Pvt. Hospitals and Nursing Homes: Applicable to Areas under Bruhat Bangalore Mahanagara Palike (BBMP), Municipal Corporations and all areas coming iunder Urban Local Bodies Sanctioned Load Fixed Charge (FC) Sanctioned Load Fixed Charge (FC)
FC per KW Rs.45/- FC per KW Rs.55
FC Minimum per Month Rs.75/- FC Minimum per Month Rs.85
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 200 KWH 625 Ps 0 to 200 KWH 650 Ps
above 200 KWH 745 Ps above 200 KWH 775 PS
5 LT-2(b)(ii) Pvt. Educational Institutions and Pvt. Hospital & Nursing Homes – Applicable to Areas coming under Village Panchayats Sanctioned Load Fixed Charge (FC) Sanctioned Load Fixed Charge (FC)
FC per KW Rs.35/- FC per KW Rs.45
FC Minimum per Month Rs.60/- FC Minimum per Month Rs.70
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 200 KWH 570 Ps 0 to 200 KWH 595 Ps
above 200 KWH 690 Ps above 200 KWH 720 Ps
6 LT-3(i) Commercial: –Applicable to areas coming under Bruhat Bangalore Mahangara Palike (BBMP), Municipal Corporations and all Urban Local Bodies Sanctioned Load Fixed Charge (FC) Rs.50/- Sanctioned Load Fixed Charge (FC) Rs.60
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 50 KWH 715 Ps 0 to 50 KWH 750 Ps
Above 50 KWH 815 Ps Above 50 KWH 850 Ps
Demand Based Tariff (Optional) Demand Based Tariff (Optional)
Fixed charges per month per KW Rs.65 per KW Fixed charges per month per KW Rs.75 per KW
Energy Charges Energy Charges
For first 50 units 715 paise For first 50 units 750 paise
For the balance units 815 paise For the balance units 850 paise
7 LT-3(ii) Commercial Applicable to Areas coming under Village Panchayats Sanctioned Load Fixed Charge (FC)/KW Rs.40/- Sanctioned Load Fixed Charge (FC)/KW Rs.50
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 50 KWH 665 Ps 0 to 50 KWH 700 Ps
Above 50 KWH 765  Ps Above 50 KWH 800 Ps
Demand Based Tariff (Optional)
Fixed charges per month per KW Rs.55 per KW Fixed charges per month per KW Rs.65 per KW
Energy Charges Energy Charges
For first 50 units 665 paise For first 50 units 700 paise
For the balance units 765 paise For the balance units 800 paise
8 LT-4(a) IP Sets – 10 HP & Below Commission Determined Tariff (CDT) FC per HP Commission Determined Tariff (CDT) Nil
286 Ps per KWH 286 Ps per KWH 286 Ps per KWH 334
9 LT-4(b) Applicable to IP Sets– Above 10 HP FC per HP Rs 40/- FC per HP Rs.50
EC per KWH 280 Ps EC per KWH 300 Ps
10 LT-4(c)(i) Applicable to – Hor. Nur., Coffee, Tea & Rubber: 10 HP & Below FC per HP Rs.30/- FC per HP Rs.40
EC per KWH 280 Ps EC per KWH 300 Ps
11 LT-4(c)(ii) Applicable to – Hor. Nur.,
Coffee, Tea & Rubber: Above 10 HP
FC per HP Rs.40/- FC per HP Rs.50
EC per KWH 280 Ps EC per KWH 300 Ps
12 LT-5 (a) Heating and Motive Power: Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations. Sanctioned Load Fixed Charge (FC)/HP Sanctioned Load Fixed Charge (FC)/HP
5 HP & below Rs.35/- 5 HP & below Rs.40
Above 5 HP but below 40 HP Rs.35/- Above 5 HP but below 40 HP Rs.45
40 HP & above but below 67 HP Rs.45/- 40 HP & above but below 67 HP Rs.60
67 HP & above Rs.110/- 67 HP & above Rs.120
Demand Based Tariff (Optional)
Above 5 HP but below 40 HP Rs.55/- Above 5 HP but below 40 HP Rs.65/-
40 HP & above but below 67 HP Rs.75/- 40 HP & above but below 67 HP Rs.90/-
67 HP & above Rs.160/- 67 HP & above Rs.170/-
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 500 KWH 510 Ps 0 to 500 KWH 525 Ps
Above 500 KWH 630 Ps Above 500 KWH 650 Ps
Sl.N
o
Tariff Category Category Description Particulars Existing Tariff as per Tariff Order-2016 Particulars Approved as per Tariff Order 2017
13 LT-5(b) Heating and Motive Power Applicable all Areas other than those covered under LT5(a) Sanctioned Load Fixed Charge (FC)/HP Sanctioned Load Fixed Charge (FC)/HP
5 HP & below Rs.30/- 5 HP & below Rs.35
Above 5 HP but below 40 HP Rs.35/- Above 5 HP but below 40 HP Rs.40
40 HP & above but below 67 HP Rs.40/- 40 HP & above but below 67 HP Rs.55
67 HP & above Rs.100/- 67 HP & above Rs.110
Demand Based Tariff (Optional
Above 5 HP but below 40 HP Rs.50/- Above 5 HP but below 40 HP Rs.55/-
40 HP & above but below 67 HP Rs.65/- 40 HP & above but below 67 HP Rs.80/-
67 HP & above Rs.150/- 67 HP & above Rs.160/-
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 500 KWH 485  Ps 0 to 500 KWH 500 Ps
501 to 1000 KWH 570 Ps 501 to 1000 KWH 590 Ps
Above 1000 KWH 600 Ps Above 1000 KWH 620 Ps
14 LT-6 (a) Water Supply FC per HP Rs.45/- FC per HP Rs.55
EC per KWH 390 Ps EC per KWH 425 Ps
15 LT-6 (b) Public Lighting FC per KW Rs.60/- FC per KW Rs.70
EC per KWH 550 Ps EC per KWH 585 Ps
EC per KWH to LED/ Induction Lightning 450 Ps EC per KWH to LED/ Induction Lightning 485   Ps
16 LT-7(a) Temporary Power Supply for all purposes Less than 67 HP Weekly Min.per.KW Rs.170/- Less than 67 HP Weekly Min.per.KW Rs.190
EC per KWH 950 Ps EC per KWH 1000 Ps
17 LT-7(b) Hoarding & Adveristment :Power Supply on permanent connection basis Fixed charges per month per KW Rs.50/- Fixed charges per month per KW Rs.60
EC per KWH 950 Ps EC per KWH 1000 Ps
HIGH TENSION SUPPLY
18 HT-1 HT Water Supply DC per KVA Rs.190/- DC per KVA Rs.200
EC per KWH 450 Ps EC per KWH 485 Ps
19 HT-2(a)(i) HT Industrial: Applicable to Areas under  Bruhat Bangalore Mahanagara Palike and Municipal Corporations. Demand Charges (DC) per KVA Rs.190/- Demand Charges (DC) per KVA Rs.210
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 1 Lakh KWH 625  Ps 0 to 1 Lakh KWH 665 Ps
Above 1 Lakh KWH 675 Ps Above 1 Lakh KWH 695 Ps
20 HT-2(a)(i) Applicable to Bangalore Metropolitan Railway Corporation Ltd. (BMRCL). Demand Charges (DC) per KVA Rs.190/- Demand Charges (DC) per KVA Rs.210
Consumption Energy Charges (EC) 570 Ps Consumption Energy Charges (EC) 600 Ps
21 HT-2(a)(ii) HT Industrial: Applicable to Areas other than those covered under HT-2(a)(i) Demand Charges (DC) per KVA Rs.180/- Demand Charges (DC) per KVA Rs.200
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 1 Lakh KWH 620  Ps 0 to 1 Lakh KWH 660 Ps
Above 1 Lakh KWH 660 Ps Above 1 Lakh KWH 680 Ps
22 HT-2(a)(i) and
HT-2(a)(ii)
Railway Traction and Effluent Treatment Plants Demand Charges (DC) per KVA Rs.190/- Demand Charges (DC) per KVA Rs.210/-
Consumption Energy Charges (EC) per KWH 590 Ps Consumption Energy Charges (EC) per KWH 620 Ps
23 HT-2(b)(i) HT Commercial Arears under Bruhat Bangalore Mahanagara Palike and  Municipal Corporations. Demand Charges (DC) per KVA Rs.210/- Demand Charges (DC) per KVA Rs.230
Consumption Energy Charges (EC) Consumption Energy Charges (EC)
0 to 2 Lakhs KWH 805 Ps 0 to 2 Lakhs KWH 845 Ps
Above 2 Lakhs KWH 835 Ps Above 2 Lakhs KWH 855 Ps
24 HT-2(b)(ii) HT Commercial Applicable to Areas other than those covered under HT-2(b)(i) Demand Charges (DC) per KVA Rs.200/- Demand Charges (DC) per KVA Rs.220
Consumption Consumption
0 to 2 Lakhs KWH 785 Ps 0 to 2 Lakhs KWH 825 Ps
Above 2 Lakhs KWH 815 Ps Above 2 Lakhs KWH 835 Ps
25 HT-2(C)(i) Applicable to Government Hospitals & Hospitals run by Charitable Institutions & ESI Hospitals and Educational Institutions belonging to Govt. , Local Bodies & Aided Institutions and Hostels of all Educational Institutions, Demand Charges (DC)per KVA Rs.180/- Demand Charges (DC)per KVA Rs.200
0 to 1 Lakh KWH 600  Ps 0 to 1 Lakh KWH 640 Ps
Above 1 Lakh KWH 650  Ps Above 1 Lakh KWH 680 Ps
26 HT-2(C)(ii) Applicable to Hospitals and Educational Institutions other than those covered under HT2(C) (i) Demand Charges (DC)per KVA Rs.180/- Demand Charges (DC)per KVA Rs.200
0 to 1 Lakh KWH 700  Ps 0 to 1 Lakh KWH 740 Ps
Above 1 Lakh KWH 750 Ps Above 1 Lakh KWH 780 Ps
27 HT-3 (a)(i) HT Lift Irrigation Schemes under Government Depts./Corporations. EC per KWH and Annual Minimum 200 Ps subject to  Min. of Rs. 1120/- per  HP per annum EC per KWH and Annual Minimum 225 Ps subject to  Min. of Rs. 1240/- per  HP per annum
28 HT-3 (a)(ii) HT Private Lift Irrigation Schemes/Societies : Connected to Urban / Express feeders F.C. per HP /PM Rs.40/- F.C. per HP /PM Rs.50
E.C. per KWH 200 Ps E.C. per KWH 225 Ps
29 HT-3 (a)(iii) HT Private Lift Irrigation Schemes
/Societies  other than those covered under HT-3 (a)(ii) (Not Connected to Urban / Express feeders)
F.C. per HP/PM Rs.20/- F.C. per HP/PM Rs.30
E.C. per KWH 200 Ps E.C. per KWH 225 Ps
30 HT-3 (b) HT supply to Agriculture/ Horticulture Farms EC per KWH and Annual Minimum 400 Ps subject to  Min. of Rs. 1120/- per  HP per annum EC per KWH and Annual Minimum 425 Ps subject to  Min. of Rs. 1240/- per  HP per annum
31 HT-4 HT Res. Apartments Applicable to all areas DC per KVA Rs 110/- DC per KVA Rs.120
EC per KWH 585 Ps EC per KWH 620 Ps
32 HT-5 Temporary Supply Fixed Charges/ Demand Charges Rs. 220/HP/Month for the entire sanctioned load / Contract demand Fixed Charges/ Demand Charges Rs. 240/HP/Month for the entire sanctioned load / Contract demand
Energy Charges 950 Ps Energy Charges 1000 Ps
33 HT-5 (a) Temporary Supply (Bangalore International Exhibition Centre). Weekly Min. per KW No Weekly Minimum charges Weekly Min. per KW No Weekly Minimum charges
EC per KWH 1050 paise EC per KWH 1100   Ps
Existing ToD Proposed ToD Approved ToD
Time of day Increase(+)/reduction(-) in energy charges  over the normal tariff applicable Time of day Increase(+)/reduction(-) in energy charges  over the normal tariff applicable
22.00Hrs to 06.00Hrs (-)125 paise per Unit 06.00Hrs to 10.00Hrs (+)100 paise per Unit
06.00Hrs to18.00Hrs 0 10.00Hrs to18.00Hrs 0
18.00Hrs to 22.00Hrs (+)100 paise per unit 18.00Hrs to 22.00Hrs (+)100 paise per unit
22.00Hrs to 06.00Hrs (-)100 paise per unit
Source: bescom.org