RFS for selection of 100 MW projects in Chhattisgarh: Extension of bid submission deadline
86
0
With reference to the RfS for selection of 100 MW Grid connected solar PV projects in Chhattisgarh (RfS No. SECI/JNNSM/P-2/B-3/RfS/CG/032016), the last date of bid submission has been extended up to 29.04.2016.
Tender Search Code: SECI-2016-TN000009
Related posts:
- NIT for 2.5 MW Solar Wind hybrid Project at Rangreek, HP: Extension of Deadline for Bid Submission
- Provn of solar power project of total 140 KW
- Installation and Commissioning of 270 kWp Floating SPV Power Plant at Muradpur Lift Irrigation Project, Wadgaon Dam, Nagpur
- Rate Contract for the Solarisation of Grid Connected Agricultural Pumps under the PM-KUSUM scheme in Kerala