Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects”
109
0
Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects”.
For more information please see below link:
Source: mnre.gov.in
tags:
Sanction for the "Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects"