![Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects”](https://www.eqmagpro.com/wp-content/uploads/2018/05/Sanction-for-the-Scheme-for-Setting-up-of-2500-MW-ISTS-connected-Wind-Solar-Hybrid-Power-Projects.jpg)
Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects”
109
0
Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects”.
For more information please see below link:
Source: mnre.gov.in
tags:
Sanction for the "Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects"