SECI: Regarding pre-bid meetings for 2 MW and 5 MW Projects at OFB Bhandara and Ambajhari
54
0
This has reference to the RfS documents for setting up of 2 MW project at Ordnance Factory Bhandara (SECI/SOLAR/SPV/OFBA/RfS/122015)and 5 MW project at Ordance Factory Ambajhari (SECI/SOLAR/SPV/OFAJ/122015) dated 22.12.2015. The pre-bid meetings for the above mentioned tenders are scheduled on 07.01.2016 and 08.01.2016 respectively. Interested bidders are requested to confirm their participation in the pre-bid-meetings latest by 04.01.2016, by sending the participants’ details to pratikpr@seci.gov.in.In view of limited seating available, it is intimated that maximum of 2 persons per Company would be allowed to attend the meeting.
Related posts:
- Application for pre qualification of Installation of 500 KWp Grid connected Roof top Solar photovoltaic power plants
- Harnessing of Solar energy on rooftop of Railway building by implementation of 1 MWp roof top solar photo voltaic system at Carriage Repair Workshop, Lower Parel, Western Railway
- Offer for Installation and 5 Years maintenance of approx 3000 nos. of Semi integrated Solar LED Street Lighting Systems in Various Villages in parliamentary constituency Pali, Rajasthan
- Providing Solar Water Pump V.P Bandhare TALUKA NAVAPUR DIST NANDURBAR