
SECOND PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 7GW ISTS CONNECTED SOLAR PV POWER PLANTS LINKED WITH SETTING UP OF 2GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING
SECOND PRE-BID MEETING : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 7GW ISTS CONNECTED SOLAR PV POWER PLANTS LINKED WITH SETTING UP OF 2GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING
This is in reference to the RfS No. SECI/C&P/RfS/2GW MANUFACTURING/P-3/R1/062019 dated 25.06.2019 regarding Selection of Solar Power Developers for Setting up of 7GW ISTS Connected Solar PV Power Plants linked with Setting up of 2GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding.
The first Pre-Bid Meeting was conducted at 1500 HRS on 10.07.2019 at SECI Office, New Delhi.
The second Pre-Bid Meeting scheduled at 1500 HRS on 17.10.2019 is being rescheduled to 1500 HRS on 21.10.2019 at SECI. The second Pre-Bid Meeting shall be conducted at SECI Office, New Delhi.
Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.seci.co.in and https://www.bharat-electronictender.com as no separate notification will be issued.
Tender Search Code (TSC) for the RfS in ETI : SECI-2019-TN000001
Tender ID for the RfS in CPPP : 2019_SECI_ 450888_1
Source: seci
Related posts:
- SECI defers bids submission for 1,200 MW wind-solar hybrid capacities till May 7
- NIT For Supply of cumulative 1.95 MW (AC) Solar PV Power Plant with 2.15 MWh BESS having 10 years Plant O&M at Lakshadweep.
- Selection of 2000 MW ISTS-connected Solar PV Power Projects (ISTS-IX)
- JSW Solar Bags 810 MW Blended Wind Energy Projects from SECI