Petition of the Power Purchase Agreement dated 21.12.2018 executed between NTPC Ltd. and Uttar Pradesh Power Corporation Limited, seeking compensation due to increase in costs on account of change in the rate of Goods & Services Tax amounting to a Change in Law event with respect to the Solar PV Power Project having project capacity of 140 MW at Bilhaur, Uttar Pradesh. NTPC Ltd.
For more information please see below link:
Related posts:
- Power Supply Agreements between APSPDCL and NTPC for purchase of 1000 MW bundle power – Amendments
- Petition for Adoption of tariff based competitive bidding process for procurement of 72 MW solar Power from Grid connect solar PV power Projects
- Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the inter-State Transmission System and selected through competitive bidding process under‘ CPSU Scheme Phase-II – EQ Mag Pro
- Petition for revision of tariff of Vindhyachal Super Thermal Power Station, Stage-I (1260 MW) for the period from 1.4.2014 to 31.3.2019 – EQ Mag Pro
tags:
NTPC