Seeking directions for treating the units fed into grid by its 3 MW solar power plant
0
0
Commission passed order I.A.(SR)No.41 of 2019 in R.P.(SR) No.38 of 2019 Dated 25.01.2021 between M/s Sarvotham Care Limited vs Southern Power Distribution Company of Telangana Limited.
For more information please see below link:
Related posts:
- APERC Reduced Tariff From ₹3.57 to ₹2.95/kWh for APGENCO’s 400 MW of Solar Power Plant in Andhra Pradesh
- Petition documents for getting Net Meter connectivity of 1 MW roof top grid connected solar power plant
- TERC permits the Petitioner to install 2 MW Solar Power Plant in phase-I for Agartala Airport