Seeking Directions for treating the units Fed into Grid by its 8 MW Solar Power Plant
0
0
Commission passed order I.A.(SR)No.43 of 2019 in R.P.(SR)No.40 of 2019 in O.P.No.47 of 2018 Dated 25.01.2021 between M/s Dubbak Solar Projects Private Limited vs Southern Power Distribution Company of Telangana Limited.