![Seeking extension of the application of the retail supply tariffs, cross subsidy surcharge and additional surcharge](https://www.eqmagpro.com/wp-content/uploads/2020/07/TSERC-Commission-invites-comments-in-the-matter-of-Suo-Moto-determination-of-variable-cost-for-existing-biomass-bagasse-and-industrial-waste-based-power-projects-in-Telangana.jpg)
Seeking extension of the application of the retail supply tariffs, cross subsidy surcharge and additional surcharge
0
0
Seeking extension of the application of the retail supply tariffs, cross subsidy surcharge and additional surcharge.
For more information please see below link.
Related posts:
- Eighth amendment to MPERC (Cogeneration and Generation of Electricity from Renewable Source of Energy) (Revision-1) of Regulations, 2010
- BTN Solar to issue appropriate direction to the respondent complete construction of requisite infrastructure beyond the Delivery Point required for evacuation of the entire contracted capacity of 100 MWs
- Prayer to direct the respondent to repay the Bank Guarantee already encashed & rejected the same
- Petition by GIFT Power for Extension of Existing PPA With M/s PTC India