
Seeking extension of time for the commercial operation of the Solar Power project
0
0
Seeking extension of time for the commercial operation of the Solar Power project
For more information please see below link:
Related posts:
- Draft Standard Bidding Documents & Guidelines for UMPPs based on allocated Coal Linkage
- In the matter of: Extension and Expansion of Pilot on Security Constrained Economic Dispatch (SCED)
- In the Matter of: Petition for recovery of compensation as liquidated damages for termination of the PPA
- Petition filed by Kosamattam Finance Ltd for the approval of PPA with KSEB Ltd for 1 MW Wind Energy Generating Unit