
Seeking extension of time for the commercial operation of the Solar Power project
0
0
Seeking extension of time for the commercial operation of the Solar Power project
For more information please see below link:
Related posts:
- Petition for enforcement of ‘must run’ status granted to solar power project
- Petitioner is entitled to only reduced tariff of Rs.4.36 per unit for the energy injected into the Grid from the Solar Power Project
- BTN Solar to issue appropriate direction to the respondent complete construction of requisite infrastructure beyond the Delivery Point required for evacuation of the entire contracted capacity of 100 MWs
- CERC Adopted Individual Tariff for 3 GW of the Power Projects
tags:
solar power project