Seeking permission to allow the drawal of start-up power for Unit-II of Lara STPP (2X800 MW) from the grid beyond the period of fifteen months.
0
0
In the matter of: Petition under Regulation 8 of Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 for seeking permission to allow the drawal of start-up power for Unit-II of Lara STPP (2X800 MW) from the grid beyond the period of fifteen months.
For more information please see below link:
Related posts:
- In the matter of: Determination of Point of Connection (PoC) rates and transmission losses
- In the matter of: Revision of tariff of Uri-II Hydroelectric Project (240 MW)
- In the matter of: Approval under Regulation: 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from DOCO
- Petition for approval of tariff for adoption of tariff for the purchase of 20 MW of solar power from SECI