Seeking review of Suo-motu Order in the matter of GBI for Off Grid Captive Solar Power Plant
0
0
Review Petition filed by KSEB Ltd seeking review of Suo-motu Order dated 11.11.2019 in the matter of Generation Based Incentive (GBI) for Off Grid Captive Solar Power Plant
For more information please see below link:
Related posts:
- Petition filed by INOX Renewable for the approval of PPA with KSEBL for 16 MW Wind Power Project at Kanjikode
- Order on granting approval for the modification in the Standard bid documents for the procurement of 200 MW from solar PV plants
- Order on exception of special energy meters
- In the Matter of: Petitioner’s newly installed 2 MW solar power plant at Kalamassery is a separate unit and do not interfere with the existing 1 MW plant