SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 10GW ISTS CONNECTED SOLAR PV POWER PLANT
MEETING WITH STATE ADMINISTRATION OF ANDHRA PRADESH : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 10GW ISTS CONNECTED SOLAR PV POWER PLANT LINKED WITH 3GW (PER ANNUM) SOLAR MANUFACTURING PLANT UNDER GLOBAL COMPETITIVE BIDDING (PHASE-I)
This has reference to the RfS No. SECI/C&P/RfS/5GW MANUFACTURING/P-1/052018 dated 25.05.2018 regarding Selection of Solar Power Developers for Setting up of 10GW ISTS Connected Solar PV Power Plant linked with 3GW (Per Annum) Solar Manufacturing Plant under Global Competitive Bidding (Phase-I).
The second pre-bid meeting for the subject tender has been organized on 06.09.2018 @ 11:00 HRS (IST) at SECI, New Delhi Office.
As discussed, a Meeting with the State Administration of Andhra Pradesh has been scheduled on 17.09.2018 @ 1500 HRS (IST) at Ground Floor, Block-2, Andhra Pradesh Secretariat, Velagapudi – 522 503, Andhra Pradesh.
Contact Persons : Sh. Manas Ranjan Mishra, Manager (C&P) and Dr. YBK Reddy, Dy. General Manager (Solar) (0091 11 71989294/ 0091 11 71989230)
It is requested that maximum 01 participant from a bidder shall attend the meeting.
Prospective Bidders are requested to send the agenda along with confirmation for participation through e-mail (contracts@seci.co.in) latest by 16:00 HRS on 11.09.2018.
Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.seci.co.in and https://www.tcil-india-electronictender.com as no separate notification will be issued.
Tender Search Code (TSC) for the RfS in TCIL : SECI-2018-TN000018
Tender ID for the RfS in CPPP : 2018_SECI_324874_1
Source: seci.co.in
Related posts:
- Minutes of the Meeting regarding “Furnishing Real Time / Daily Renewable Energy Generation Data” held at Jaipur, Rajasthan on 04-05-2018 under the Chairmanship of Member (Planning), CEA
- Utility Spending on Blockchain-based Platforms is Expected to Reach $3.7 Billion by 2026
- Procedure For Forecasting, Scheduling and Deviation Settlement of Solar & Wind Generation
- NHPC raises Rs 750 crore via bonds