![Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects at Rihand Dam](https://www.eqmagpro.com/wp-content/uploads/2018/05/Setting-up-of-150-MW-50-MW-x-3-Grid-Connected-Floating-Solar-Power-Projects-at-Rihand-Dam.jpg)
Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects at Rihand Dam
367
0
Work Description Selection of Solar Power Developers for Setting up of 150 MW (50 MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam, Sonbhadra District, Uttar Pradesh under Global Competitive Bidding
Tender Value in Rs.: 600 Crore
For more information please see below link:
Related posts:
- Procurement of store for repair and maintenance of solar light and 12 volt secondery batteries ( against BER) for solar light in BOPs of 63 BN BSF under SHQ BSF Barmer (Raj)
- Engineering Procurement Construction EPC inclusive of 1 Year Comprehensive Operation and Maintenance O and M of 15.0KWp OnGrid with 3KWp Battery backup Roof Mounted Captive Solar Power Project at IndianOil
- Prov. solar high mast in the premises of Govt. ITI at Deola, Tal. Deola, Dist. Nashik
- INVITING RATES FROM EMPANELLED SUPPLIERS FOR SUPPLY OF 1MW-SOLAR POWER PLANT