1. Home
  2. India
  3. Solar PLI tranche-II results show 32 per cent lesser response than tranche-I :Bridge to India – EQ Mag
Solar PLI tranche-II results show 32 per cent lesser response than tranche-I :Bridge to India – EQ Mag

Solar PLI tranche-II results show 32 per cent lesser response than tranche-I :Bridge to India – EQ Mag

0
0

New Delhi: The total response for the Solar Energy Corporation of India’s (SECI) tranche-II of the production-linked incentive (PLI) scheme was 32 per cent lesse …Read More

Source: PTI
Anand Gupta Editor - EQ Int'l Media Network