Supply, erection, installation and commissioning of 3 KW solar panel with pump etc.
16
0
Supply, erection, installation and commissioning of 3 KW solar panel with pump etc.
For more information please see below link:
Related posts:
- TENDER OF RATE Contract for Grid Connected Rooftop Solar Power Plants
- Design, Manufacture, Supply, Erection, Testing and Commissioning of Stand-alone OFF Grid 4,900 Nos. of 12W LED based Solar Street Lights in the Constituencies of Himachal Pradesh, Uttar Pradesh & Uttarakhand
- Design, Manufacture, Supply, Erection, Testing and Commissioning of Stand-alone OFF Grid Solar LED Street Lights in) PAN India basis including complete system warranty and its AMC for 5 Years under ATAL JYOTI YOJANA (AJAY) of Ministry of New & Renewable Energy (MNRE), Government of India
- DESIGN, ENGINEERING, FABRICATION, SUPPLY, TRANSPORTATION, STORAGE, INSURANCE, ERECTION, TESTING AND COMMISSIONING OF SOLAR STEAM COOKING SYSTEM FOR 1000 PERSON PER DAY