SUPPLY, FIXING , TESTING , AND COMMISSIONING OF 500Wp MINI SOLAR POWER SYSTEM
26
0
SUPPLY, FIXING , TESTING , AND COMMISSIONING OF 500Wp MINI SOLAR POWER SYSTEM
For more information please see below link:
Related posts:
- SUPPLY, FIXING , TESTING , AND COMMISSIONING OF 500Wp MINI SOLAR POWER SYSTEM
- Design, Procurement, Supply, erection, testing, commissioning and maintenance for Five years of 3 MWp grid connected Floating Type Solar PV Power Project on Meghadrigedda Reservoir in VISAKHAPATNAM District along with grid connecting equipment including associated Electrical & Civil Works
- Design, Supply, Testing, Installation and commissioning of solar pv plant to generate 100kwp on disignated hill of IIT Bombay
- Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 160 MW of Solar Power Generating System (SPGS) ranging from 250 kW to 2 MW at various sub-stations/locations in Maharashtra, India.