Supply, installation and COMC (5 years) Solar Hand Pumps for ProjectAffected area of Talaipalli Coal Mining Project, Raigarh (CG).
11
0
Supply, installation and COMC (5 years) Solar Hand Pumps for ProjectAffected area of Talaipalli Coal Mining Project, Raigarh (CG).
For more information please see below link:
Related posts:
- Supply, installation and COMC (5 years) “Solar Hand Pumps” for Project Affected area of Talaipalli Coal Mining Project, Raigarh (CG)
- Design, Manufacture, Supply, Erection, Testing and Commissioning of Stand-alone OFF Grid Solar LED Street Lights in) PAN India basis including complete system warranty and its AMC for 5 Years under ATAL JYOTI YOJANA (AJAY) of Ministry of New & Renewable Energy (MNRE), Government of India
- Design, Development, Supply, installation and commissioning of Ignitability tests facilities for Solar PV Module as per IEC 61730-2 2016 MST 24 at National Institute of Solar Energy, Gurugram, Haryana -122003, India
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISIONING O and M FOR A PERIOD OF 5 YEARS OF TOTAL 4 kW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT
tags:
installation and COMC (5 years) Solar Hand Pumps for ProjectAffected area of Talaipalli Coal Mining Project Raigarh (CG). Supply