Supply, Installation and Commissioning of Solar Water Heater of 500 LPD at 5 Districts (Package-6)
21
0
Supply, Installation and Commissioning of Solar Water Heater of 500 LPD at 5 Districts (Package-6)
For more information please see below link:
Related posts:
- Extension of bid submission deadline for RfS for 250 MW solar PV project in Charanka Solar Park
- PRE-BID MEETING NOTIFICATION : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP
- Construction Of Solar Energy Based Dual Pump Mini Water Supply Scheme On Existing Borewell At Grampnchayt Umarzari
- SUPPLY AND INSTALLATION OF SOLAR STREET LIGHT AT VILLAGES HATDI, SURAJBARI AND KHIRAI UNDER CSR SCHEME