Supply, Installation, Testing and Commissioning of 50kW (peak) Rooftop, grid connected Solar PV Power Plant at Administration Building, TAPS-3&4 Plant Site
44
0
Supply, Installation, Testing and Commissioning of 50kW (peak) Rooftop, grid connected Solar PV Power Plant at Administration Building, TAPS-3&4 Plant Site.
For more information please see below link:
Related posts:
- Design, supply, Installation of Grid Interactive Solar PV System of capacity 12 KWp each for captive Power generation
- Supply, Fabrication, testing and transportation of flatbed foldable solar dryer of 25 Kg capacity
- SUPPLY OF TOTAL 775 KWP CAPACITY GRID CONNECTED ROOFTOP SOLAR PV SYSTEM
- SOLAR POWER PLANT 150KW (75KW X 2 NOS)-01 NO.