SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI-CRYSTALLINE PV MODULES AT DEPARTMENT OF PHYSICS
47
0
SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI-CRYSTALLINE PV MODULES AT DEPARTMENT OF PHYSICS BUILDING IN UNIVERSITY CAMPUS AURANGABAD. CAPACITY- 20KWP.
For more information please see below link:
Related posts:
- SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI-CRYSTALLINE PV MODULES AT MAIN ADMINISTRATIVE BUILDING
- Selection of Solar Power Generation Plant Bidders for Design, Engineering, Manufacturing, Supply, Installation, Testing, Commissioning, Operation and Maintenance of Cumulative Capacity of 42 MWp
- EXPRESSION OF INTEREST FOR Design, supply, installation, testing, commissioning, operation and maintenance of 10 MWp Solar power plant on RESCO model at National Cancer Institute at Badsa, Jhajjar, Haryana
- Supply, installation, testing, and commissioning of 19kWp Grid Connected Roof Top Solar PV System at HPO, Nahan
tags:
COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI-CRYSTALLINE PV MODULES AT DEPARTMENT OF PHYSICS BUILDING IN UNIVERSITY CAMPUS AURANGABAD. CAPACITY- 20KWP INSTALLATION Supply Testing