SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI-CRYSTALLINE PV MODULES AT MAIN ADMINISTRATIVE BUILDING
37
0
SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI-CRYSTALLINE PV MODULES AT MAIN ADMINISTRATIVE BUILDING IN UNIVERSITY CAMPUS AURANGABAD. CAPACITY- 20KWP.
For more information please see below link:
Related posts:
- Supply, installation, testing, commissioning and maintaining roof top grid interactive PV solar power plant using multi crystalline PV modules at following building in University Campus
- Supply, installation, testing, and commissioning of 15kWp Grid Connected Roof Top Solar PV System at HPO, Khanna, Punjab
- Selection of Bidders for Design, Engineering, Manufacturing, Supply, Installation, Testing, Commissioning, Operation and Maintenance of Cumulative 2MWp Grid Connected Rooftop Solar Photovoltaic Power Generation Plant on the basis of RESCO mode. Rate
- Design, fabrication, supply, installation, testing, commissioning with remote monitoring system of total 50 kw capacity grid-connected solar pv power plant under roof-top net metering system at district planning office building
tags:
COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI-CRYSTALLINE PV MODULES AT MAIN ADMINISTRATIVE BUILDING IN UNIVERSITY CAMPUS AURANGABAD. CAPACITY- 20KWP. INSTALLATION Supply Testing