SUPPLY, INSTALLATION, TESTING,COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI- CRYSTALLINE PV MODULES AT EXAMINATION BUILDING
68
0
SUPPLY, INSTALLATION, TESTING,COMMISSIONING AND MAINTAINING ROOF TOP GRID INTERACTIVE PV SOLAR POWER PLANT USING MULTI- CRYSTALLINE PV MODULES AT EXAMINATION BUILDING IN UNIVERSITY CAMPUS AURANGABAD. CAPACITY- 20KWP
For more information please see below link:
Related posts:
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISIONING AND OPERATION, MAINTENANCE FOR A PERIOD OF 5 YEARS, OF TOTAL 50 KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT UNDER ROOF-TOP NET METERING ALONG WITH SUPPLY, ERECTION, TESTING AND COM
- Supply, installation, testing, and commissioning of 25kWp Grid Connected Roof Top Solar PV System at HPO, Udhampur, J&K
- DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF 83 kW GRID CONNECTED SOLAR PV POWER SYSTEMS
- DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING, COMMISSIONING WITH RMS FOR CUMULATIVE TOTAL 398 KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT